1.   Utility line, Flare, let down station, gas and water station in Assaluyeh-Mobin Petrochemical 2 (PC)
2.   Crude oil storage Tank in Lavan Island (EPC)
3.   Temporary utility line for Mehr and Morvarid complex (C)
4.  56” Saveh/Qazvin Gas Pipeline (PC)
5.   Lavan Island wellhead facilities and gas transmission line (EPC)
6.   30” Iran- Armenia Export Gas Pipeine (EPCM)
7.   Nargesi Gas Gathering & Injection (EPC)
8.   Khonj - Lar Gas Pipeline  (PC)
9.   Parsian (Tabnak) Gas Refinery  (EPC)
10.   Top Deck Installation on Petrochemical Port (Mobin) -Assaluyeh  (EPC)
11.   Sardasht Gas Compressor Station (C)
12.   Kangan Gas Compressor Station (C)
13.  10" Arak Gas Pipeline (PC)
14.  Imam Khomeini International Air Port, Piping System(PC)
15.  56" Gas Pipeline , Loop Line, IGAT II (C)
16.   56" Farashband – Kazeroon - Nourabad Gas  Pipeline, Loop Line, IGAT II  (C)
17.   56" Pataveh - Brojen Gas Pipeline (C)
18.   48" Zanjan - Mianeh Gas Pipeline (C)
19.   36" Ahwaz - Omidiyeh Oil Pipeline (C)
20.   30",  8" Sui & Panjab (Pakistan) Gas Pipeline (C)
21.  30" Nour – Ramsar Gas Pipeline
22.  26” Tangefani - Asar Oil Pipeline (C)
23.  20” Firouzkouh Gas Pipeline (C)
24.  20" Tabriz - Azarshahr Gas Pipeline (C)
25.   20" Kouhpayeh - Yazd Gas Pipeline (C)
26.   20" Azarshahr - Miyandoab Gas Pipeline (C)
27.  16" Hamedan - Kabudarahang Gas Pipeline (C)
28.  16" Karanj Parsi Gas Injection (C)
29.  12" Neishaboor - Sabzevar Gas Pipeline (C)
30.  6", 16" Semirom - Abadeh & Eghlid Gas Pipeline (C)
31.  Tehran Gas Distribution Network, Darband – Shamsabad & Shahrak Qods,Zone 2, 4, 9, 10, 13  (C)

 